Client
Mount Anvil
Date of completion
24 weeks
Value
£1.4m
Scope of works
-
Groundworks
-
Drainage
-
RC frame
Project key points
-
Construction of pile caps and ground beams
-
Installation of suspended below ground drainage
-
Gas mitigation measures incorporated into the substructures
-
Construction of in-situ reinforced concrete walls, columns and slabs for ten-storey superstructure including in-situ stairs and lift cores
-
Cantilevered balconies with integral thermal breaks and fair-face finish to soffits and edges.