Project Profile: Atlanta Boulevard

Client
Mount Anvil
Date of completion
24 weeks
Value
£1.4m
http://toureen.zincdesign.co.uk/atlanta-boulevard

Scope of works

 

  • Groundworks

  • Drainage

  • RC frame

 

Project key points

 

  • Construction of pile caps and ground beams

  • Installation of suspended below ground drainage

  • Gas mitigation measures incorporated into the substructures

  • Construction of in-situ reinforced concrete walls, columns and slabs for ten-storey superstructure including in-situ stairs and lift cores

  • Cantilevered balconies with integral thermal breaks and fair-face finish to soffits and edges.