Asda, Rossington
Full groundworks and installation of underground storage tanks in Rossington, South Yorkshire
Shell, Bracknell
The redevelopment of a Shell petrol filling station including shop establishing works, located in Bracknell
BP, Old Windsor
Toureen was appointed as principal contractor by the Global Alliance for the redevelopment works at BP Old Windsor, Berkshire
Cooperative Group, Old Malden
Groundworks, building shell fit-out, full development of retail space including electrics and refrigeration
